Check your suppliers' plots for deforestation.
If you're an EU importer, you also get the papers to file.
Each plot checked against the 2020 EUDR cutoff
A sample cooperative in Sulawesi. Open a plot to see it before and after the cutoff.
0 of 15 plots checked
-
Rante Baru GrowersLT-COC-016.8 ha
Finding. 4.5 ha of 2020 forest cleared inside the plot.
2020 forest cleared within 500 m, 41.6 ha
- 2.82021
- 5.42022
- 12.62023
- 10.22024
- 10.62025
Drag the line on the map to compare. In the app you review the plot and record your decision. A finding is not a legal conclusion.
-
Tanjung Asri SmallholdersLT-COC-035.9 ha
Finding. 1.1 ha of 2020 forest cleared inside the plot.
2020 forest cleared within 500 m, 12.4 ha
- 0.72021
- 3.22022
- 5.82023
- 1.32024
- 1.42025
-
Pondok Teduh FarmLT-COC-157.5 ha
Caution. 8.1 ha of trees lost within 500 m, but the EU's 2020 map shows almost no forest here.
Trees lost within 500 m, 8.1 ha
- 0.12021
- 0.22022
- 0.82023
- 3.12024
- 3.92025
12 plots with no signal, 28.9 ha



Finding
Rante Baru Growers
Forest near this plot was cleared after 2020.
Drag to compare. In the app, you review it and record your decision.
No signal
Sungai Lima Growers
No tree-cover change found within 500 m of this plot.
Finding
Tanjung Asri Smallholders
Forest near this plot was cleared after 2020.
Drag to compare. In the app, you review it and record your decision.
No signal
Bukit Jati Farm
No tree-cover change found within 500 m of this plot.
No signal
Lembah Sari Growers
No tree-cover change found within 500 m of this plot.
No signal
Padang Rio Farm
No tree-cover change found within 500 m of this plot.
No signal
Kebun Cahaya
No tree-cover change found within 500 m of this plot.
No signal
Mata Air Growers
No tree-cover change found within 500 m of this plot.
No signal
Batu Hijau Farm
No tree-cover change found within 500 m of this plot.
No signal
Kampung Pala Growers
No tree-cover change found within 500 m of this plot.
No signal
Sinar Lembah Farm
No tree-cover change found within 500 m of this plot.
No signal
Kelompok Tani Salu Pao
No tree-cover change found within 500 m of this plot.
No signal
Tepi Sungai Farm
No tree-cover change found within 500 m of this plot.
No signal
Sawah Indah Growers
No tree-cover change found within 500 m of this plot.
Caution
Pondok Teduh Farm
Trees were lost near this plot after 2020, but the EU's 2020 forest map shows no forest here.
It may be a tree crop like shaded cocoa, which is not forest under the EUDR, or forest the map missed.
In the app, you decide which it was.
Complete supplier collection, from one link
Suppliers add their plots, land documents and harvest dates on any phone, in their own language, with no account. Nothing goes into your declaration until you accept it.
Nordhafen Cocoa Imports GmbH needs to know where your cocoa comes from and that it was produced lawfully.
Nordhafen Cocoa Imports GmbH perlu tahu dari mana kakao Anda berasal dan bahwa produk itu diproduksi secara sah.
Please send by 14 November 2026
0 of 3 required items done
What is needed
- Your plotsAll the plots you supply fromOpen
- Documents about lawful productionOpen
- Harvest dateOpen
Collected securely with EUDR Screening
New plot
Place more corners, or tap the first corner to close the outline.
Is this the whole field where your cocoa grows?
Before you send
- Plot 1LT-COC-02 · about 1.7 ha OK
- Plot 2LT-COC-05 · outline FixThe lines of this outline cross, which the EU's rules do not allow.
- Land titlePhoto · covers plots 1 and 2 · valid until 2031 OK
- Harvest dateMarch to June 2026 OK
- A photo on your plotWith its location and time OK
Collected securely with EUDR Screening
Your plots
- LT-COC-05Outline · about 1.0 haSentAccepted
- Land titlePhoto · covers LT-COC-02 and 05SentAccepted
Your customer asks about these plots
Please check this plot and draw it again if it is not right.
Their note: the north edge runs into the forest. Draw only the cocoa.
Check and redrawCollected securely with EUDR Screening
What you have when you file
From your suppliers' plots to the filed statement and the records you keep.
-
Every plot mapped
Location, harvest date and supplier.
-
Legality documents
Land titles, permits and harvest records, sent by each supplier from a phone.
-
Every plot checked
Against the EU 2020 forest map, with images from before and after.
-
Your signed risk assessment
Each risk criterion answered, a decision on every flagged plot, your conclusion signed.
-
File in TRACES
Send from the app with your company's TRACES key, or file by hand with our plot file and guide.
-
Kept for five years
One file per declaration, to download any time and hand over when an authority asks.
-
A summary for your buyers
One page to send them: how many plots were checked and filed, without supplier names.
-
A year of monitoring
Weekly satellite checks where alert data exists, and an email if trees are lost near your plots.
Fictional plots and documents. Relief: SRTM via Terrain Tiles. Imagery: Esri, Maxar.
Your role
EU importer
The statement, the plot file and the record behind them.
Due 30 Dec 2026; firms small on 31 Dec 2024: 30 Jun 2027 (not EUTR timber)EU buyer
Check your supply chain and keep your suppliers' reference numbers.
Outside the EU
Check your plots and share dated reports with your buyers.
Questions and answers
Does a result prove EUDR compliance?
No. It's evidence to support your own due diligence decision, not a legal finding. You review the results and sign the conclusion yourself. See our methodology for how results are produced and where the limits are.
Does this file my declaration for me?
It sends it only when you press Sign and send, with your company's own TRACES key, so you are the filer. Or file in TRACES yourself with our plot file and guide, and enter the reference number here.
What does it cost?
No subscription. You pay for each statement you file, by the tonnes it declares, and each tonne costs less as your year adds up: 32 t of cocoa in a year costs €664. Supplier collection, the checks and a year of plot monitoring are included. See pricing.
Do I need a tool at all?
If you buy from another EU operator, you file no declaration of your own and only keep records of your suppliers and customers. A small direct importer can also work by hand with the free EU forest maps. The tool saves the batch checking, the imagery and the assembly of a dated record and filing files.
What stays with you?
We prepare, check and record. Your company keeps the legal responsibility. A large company also needs its own compliance officer, an independent audit function and an annual public report (Articles 11(2) and 12(3)).
What happens to my supplier data?
Satellite queries only ever see coordinates, never supplier names or addresses. Unpaid checks and their files are deleted automatically. See the Privacy Policy for exact retention.